West Ave Bridge

The bridge construction will begin August 2015 which is to coincide with the West Avenue streetscape project.  A small park was to be located on the west side of the bridge, however, severe flooding in this area requires a large pump station to occupy that space instead. UPDATE, the bridge was completed October 2017.

West Ave Bridge 2016

West Ave Bridge crossing Collins Canal